Previous Article: Unify - Operations Menu: PGT Deployment
32 – On the graph the user will see by default the monthly data. The data represent the Pressure value over time.
33 – The PRESSURE VALUE can be viewed in the top-left corner.
34 – On the right-side column, the user can scroll down to access the PGT info related.
35 – To see the accumulated data over that time period, hover the cursor over the graph and a tooltip will appear automatically.
36 – Edit the time range to the desired range.
37 – In this example, the time range selected was “LAST WEEK”.
EDIT PGT
38 – To edit a PGT, click on the “…” icon next to the PGT name on the top-right corner.
39 – Click on “EDIT”.
40 – A pop-up window will appear. Edit the necessary fields and click on “SAVE” to apply the changes.
41 – The screen will refresh and go automatically to the Tank page. On the top-right corner a message in color green will appear stating “The pressure gauge <PGT NAME> has been updated.”.
DELETE PGT
42 – To delete a PGT, click on the “…” icon next to the PGT name on the top-right corner.
43 – Click on “DELETE”.
44 – A pop-up window will appear requesting confirmation and stating that all assets in this site will be deleted and no longer monitored, and their devices will be unlinked. Click on “DELETE” to confirm.
45 – The screen will refresh and go automatically to the PRESSURE GAUGES page. On the top-right corner a message in color green will appear stating “The pressure gauge <NAME> has been deleted.”.
DOWNLOAD READINGS
46 – To download the reading of the selected timeframe, click on “ACTIONS” button.
47 – Select the option “DOWNLOAD READINGS”.
48 – The system will download a file with the readings of all assets of that site.
Next Article: Unify - Operations Menu: PGT Reports
Comments
0 comments
Please sign in to leave a comment.